Repository navigation
DCO-2 / DCO
succeeded
Oct 29, 2026 in 1s
Check passed!
All commits are signed off, the check passed.
Summary
| Sha | Message | Pass or fail reason | |
|---|---|---|---|
| 🟢 | 169e424 | lazy materialization better handles aliases if que... | Valid sign-off found |
| 🟢 | e394f5e | Merge branch 'antalya-25.8' into bugfix/antalya-25... | Skipped: sign-off not required in merge commit |
| 🟢 | cc061f5 | no-parallel-replicas | Valid sign-off found |
| 🟢 | 50c018d | Merge remote-tracking branch 'origin/bugfix/antaly... | Skipped: sign-off not required in merge commit |
| 🟢 | f633249 | stupid merge collision resolved, test is more stab... | Valid sign-off found |
Loading