Website-only maintenance: refresh the build toolchain, bring the dependencies up
to date, and move the Workers compatibility date to the newest value the pinned
toolchain can actually run.

Toolchain

  • pnpm 10.34.6 → 12.11.2 via packageManager, and pnpm/action-setup@v4 →
    v6 in main.yml so CI sets up the same version.
  • onlyBuiltDependencies → allowBuilds (same three packages; the old key is
    deprecated). Unlisted packages still keep their install scripts disabled.
  • Added minimumReleaseAge: 4320 — a three-day cooldown on newly published
    packages, for supply-chain hardening. A frozen install also fails while any
    lockfile entry is younger than the cooldown, so a bump has to wait for it.
    That is why satori stops at 0.47.1 here rather than 0.56.x; it can follow up
    once the release is old enough.
  • supportedArchitectures.cpu keeps wasm32 next to current. The Cloudflare
    bundle needs the Sätteri WASI fallback; without it the build fails with
    Rolldown failed to resolve import "@bruits/satteri-wasm32-wasi".

Dependencies

Package From To
astro ^7.3.5 ^7.3.8
@astrojs/starlight ^0.42.4 ^0.42.6
@astrojs/cloudflare ^14.3.3 ^14.3.4
motion ^13.4.5 ^14.1.0
satori ^0.33.5 ^0.47.1
@fontsource/noto-sans-sc ^5.3.0 ^5.3.1
@lucide/astro ^1.48.0 ^1.55.0
wrangler ^4.143.0 ^4.149.0

motion 14 is a major bump but documents no breaking changes. All four call sites
(BaseLayout, HookIntro, TapeModel, Testimonials) were re-checked in a
browser, including the prefers-reduced-motion branches.

satori renders the OG images at build time. Rendering identical inputs with
0.33.5 and 0.47.1 differs only by sub-pixel antialiasing on the CJK description
line (max channel delta 16–18); 0.47.1 and 0.56.x render byte-identically. The
0.34–0.47 line rewrites the CSS engine from yoga-layout to layout.wasm, which
is why the satori>fflate advisory override stays in place.

Workers compatibility date

2026-04-22 → 2026-10-13. Cloudflare advises tracking the current date, but the
ceiling here is the workerd binary bundled with wrangler: a date newer than
that binary makes pnpm dev and pnpm preview refuse to start. With wrangler
4.149.0 (workerd 1.20261006.1), 2026-10-13 starts and 2026-10-14 does not.

Crossing 2026-08-04 enables nodejs_compat by default. It does not change the
upload: the Astro adapter emits no_bundle: true, so Wrangler never bundles the
Worker and never injects the unenv polyfills. wrangler deploy --dry-run on a
single build produced byte-identical output (557 modules, same gzip size) for
every date from 2026-08-03 through 2026-10-14.

Docs

DEPLOYMENT.md only loses lines that no longer match the repository — the legacy
MkDocs transition note, the "deploys via Git integration rather than Actions" line
that is repeated a few sections lower, and a second copy of the required
Cloudflare project settings. Its one addition is the package manager version in
the Cloudflare project settings list.

Pre-commit

check-yaml gains --allow-multiple-documents. pnpm 12 writes pnpm-lock.yaml
as two YAML documents — an env document holding the pinned package manager and
its binaries, then the project document — and the hook rejects more than one
document by default.

Impact

website/ only, plus the check-docs job in .github/workflows/main.yml. No
changes to Python or runtime code.

Verification

  • pnpm --dir website install --frozen-lockfile — passes, including the new
    supply-chain policy check.
  • pnpm --dir website build — passes, OG images included.
  • wrangler deploy --dry-run across the compatibility-date range above.
  • Manual browser pass over the animation paths and their reduced-motion branches.

Known warnings

Pre-existing and unchanged by this PR:

  • Vite reports Unexpected Node.js imports for environment "ssr" for the Sätteri
    WASI package and for postcss; both are dead code at runtime.
  • One shared 646.6 kB Mermaid chunk. Nothing on the critical HTML path references it.

- wrangler 4.143.0 -> 4.149.0
- pnpm 10.34.6 -> 12.11.2
- `onlyBuiltDependencies` -> `allowBuilds`, which is what pnpm 11 renamed it to
- `minimumReleaseAge: 4320`: three days, to block supply-chain attacks
- CI: pnpm/action-setup v4 -> v6, the first major that installs pnpm 12

wrangler stops at 4.149.0 because 4.150.0 is younger than the cooldown.

Verified: frozen install, build, and deploy dry-run (417 assets, only `ASSETS`).
One day before 2026-08-04, where Cloudflare starts enabling the `nodejs_compat`
flags for every Worker and the upload grows.
- astro 7.3.5 -> 7.3.8
- @astrojs/starlight 0.42.4 -> 0.42.6
- @astrojs/cloudflare 14.3.3 -> 14.3.4
- @fontsource/noto-sans-sc 5.3.0 -> 5.3.1
- @lucide/astro 1.48.0 -> 1.55.0 (dev)

Everything stays within the existing semver ranges and passes the
three-day release cooldown. satori (0.33 -> 0.47) and motion (13 -> 14)
are left out on purpose: both majors need their own verification pass.

Verified: frozen install, `BUB_ASTRO_IMAGE_MODE=build pnpm build`.
motion 14.0 has no breaking changes for the JavaScript API. It only deprecates
internal APIs and pins its internal dependencies exactly, which shows up here
as `framer-motion: 14.1.0` instead of `^13.4.5`.

Audited every call site (HookIntro, TapeModel, Testimonials, BaseLayout). The
site only uses `animate`, `inView`, and `stagger`, with `duration`, `ease`,
`delay`, transforms, and `controls.stop()`. None of the earlier renames apply:
`easing` -> `ease` and `stagger`'s `start` -> `startDelay` landed in 11.0, and
the 12.0 `inView` callback signature already matches.

Verified: frozen install, `BUB_ASTRO_IMAGE_MODE=build pnpm build`, and the
client bundle. Only the shared animate chunk grows, 52,480 -> 52,863 B
(gzip 18,803 -> 18,953 B); the viewport (inView) chunk is byte identical
with the same content hash. Total JS 3,539,565 -> 3,539,948 B.
satori 0.34 through 0.47 rewrote the CSS engine: it drops the `yoga-layout`
dependency in favour of its own `layout.wasm`, applies `opacity` per group,
interpolates gradients in their own colour space, and aligns text by baseline.

Verified against the 0.33.5 baseline with a per-pixel diff of all eight
prerendered OG images. Differences are confined to the CJK description line
(bbox x 62-550, y 407-437) and top out at maxΔ 16-18 with meanΔ 0.003-0.009,
i.e. sub-pixel antialiasing. Titles, logo and the gradient background are
byte-identical, so the gradient colour-space change is a no-op for this card.

The yoga-layout removal drops three lockfile entries. satori stays a
build-time-only dependency: it does not appear in dist/server.

Verified: frozen install, `BUB_ASTRO_IMAGE_MODE=build pnpm build`.
The old value stopped one day before 2026-08-04 to avoid the nodejs_compat
defaults, on the assumption that crossing the line grows the upload. That
assumption does not hold for this project, and the date was costing us the
Node.js builtins: the SSR bundle imports `node:fs`, `node:wasi`,
`node:worker_threads` and `node:path`, which cannot resolve at a date before
2026-08-04 without the flag.

Measured on a single build with `wrangler deploy --dry-run`, patching only the
date: 2026-08-03, 2026-08-04, 2026-10-01, 2026-10-06, 2026-10-13 and 2026-10-14
all produce byte-identical output -- 557 modules, same gzip size. An explicit
`nodejs_compat` flag does not change it either. The Astro adapter emits
`no_bundle: true`, so Wrangler never bundles the Worker and never injects the
unenv polyfills the docs describe.

2026-10-13 is the ceiling rather than the current date because wrangler ships
the workerd binary: at 2026-10-14, `wrangler dev` refuses to start with
"This Worker requires compatibility date \"2026-10-14\", but the newest date
supported by this server binary is \"2026-10-13\"". wrangler 4.149.0 pins
workerd 1.20261006.1; raise wrangler before raising the date.

Behaviour verified against the pinned wrangler dev server: every route still
serves, no runtime warnings, and the SSR output for `/` and `/zh-cn/` is
byte-identical to the same build running at 2026-08-03.

Verified: `pnpm install --frozen-lockfile`, `BUB_ASTRO_IMAGE_MODE=build pnpm build`,
`pnpm exec wrangler deploy --dry-run` (still only the ASSETS binding).
Two of these were verbatim duplicates: the required Cloudflare project
configuration was already listed a few lines earlier under "recommended
settings", and the Git-integration statement is covered by the responsibilities
section at the end of the file.

The MkDocs paragraph is stale -- the repository has no `mkdocs.yml` and no root
`docs/` -- and the only fact it carried, that production targets Cloudflare
Workers, is already the subject of the section directly below it.

Deletions only, 14 lines; no wording was changed.
pnpm 12 writes pnpm-lock.yaml as two YAML documents: an env document holding the pinned package manager and its binaries, and the project document. check-yaml rejects any file with more than one document unless --allow-multiple-documents is set.
Both restated what the configuration already says. The compatibility-date constraint now sits as a comment next to the value in wrangler.jsonc, and the cooldown is documented by the minimumReleaseAge comment in pnpm-workspace.yaml.
@PsiACE
PsiACE merged commit d91a390 into bubbuild:main Oct 14, 2026
5 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants