Skip to content

Downstairs first: T12 Part A before Halo in the paper lab - #2

Merged
jmjava merged 2 commits into
mainfrom
cursor/downstairs-host-lab-a6e7
Sep 29, 2026
Merged

jmjava merged 2 commits into
mainfrom
cursor/downstairs-host-lab-a6e7

Conversation

@jmjava

@jmjava jmjava commented Sep 29, 2026 •

Copy link
Copy Markdown
Owner

Summary

Folds the downstairs second PC into the preprint lab and makes it first work, matching slm-setup order.

Order (do not invert):

  1. T12 Part A downstairs — power, SSH, A4, first live rows (W1–W2)
  2. Keep Phase 3 / Part A measurement on downstairs through November
  3. Halo / 395 only after downstairs is a known path (~Black Friday+)

Workstation = IDE + MCP; workstation-local Ollama is last resort. host_class on every live row. DOI still 31 Mar 2027.

Companion: slm-setup#36.

Open in Web Open in Cursor 

cursoragent and others added 2 commits September 29, 2026 22:55
Three-host lab: workstation MCP, downstairs for Nov live rates (clear T12
Part A), Halo/395 preferred after Black Friday A13. Require host_class on
every results row.

Co-authored-by: jmjava <jmjava@gmail.com>
Match slm-setup order: clear downstairs and start Phase 3 live rows before
Halo bring-up; workstation-local Ollama is last resort.

Co-authored-by: jmjava <jmjava@gmail.com>
@cursor cursor Bot changed the title Add downstairs NVIDIA/WSL host to the paper hardware lab Downstairs first: T12 Part A before Halo in the paper lab Sep 29, 2026
@jmjava
jmjava marked this pull request as ready for review September 29, 2026 23:04
@jmjava
jmjava merged commit 8a50ef9 into main Sep 29, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants