Repository navigation
Downstairs T12 Part A is next work before Halo - #36
Merged
Merged
Conversation
Point operators at embabel-slm paper-calendar-2026 for venue, citations, and claim freeze while live rates stay measured in this repo. Co-authored-by: jmjava <jmjava@gmail.com>
Align eval-protocol and roadmap wording with the extended embabel-slm calendar. Co-authored-by: jmjava <jmjava@gmail.com>
Keep Phase 3 live rates on the workstation until A13 passes. Co-authored-by: jmjava <jmjava@gmail.com>
Prefer downstairs for live rates until the 395 passes A13. Co-authored-by: jmjava <jmjava@gmail.com>
Phase 3 live rates default to downstairs; do not skip it to chase the 395. Co-authored-by: jmjava <jmjava@gmail.com>
jmjava
marked this pull request as ready for review
September 29, 2026 23:03
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Aligns the roadmap with the paper calendar: downstairs is next hardware work.
Order: Phase 3 live rates on downstairs (T12 Part A) → then Halo/395 after Black Friday. Do not skip downstairs to chase the 395. Workstation-local Ollama is not the Phase 3 path.
DOI: 31 Mar 2027. Plan: paper-calendar-2026.md